The headwaters sanctuary the piggery (field) tore down an in expiation of follow-up auditor the work result summary of the control project by law

Absrtact
The project was carried out from March 30, 2006, the contract date, to December 19, 2006. The pig farmer (piggery) inspection and patrol work in Kaoping River Water Source Protection Zone after the compelled removing and indemnification works by operation of law.Pig farm (piggery) that already moved and applied for indemnification. Presently there were already 1,609 pig farms co-operating with the law and moved out of the area. On the side, 19 pig farms (pigsties) did not match up to move but have dismantled the pigsty and reconstructed for other uses,having no concern for re-breeding. Pig farm (piggery) that did not co-operate to dismantle and move. As of December 19, 2006, there were 207 pig farms under this section, among which 35 were sill in operation and 172 had stopped operation. As of December 19, 2006, four inspection and patrol were actually carried out on in April, June, September and November, in connection with pig farmers that did not dismantle pigsty but have stopped operations. For pig farmers that did not dismantle their pigsty and still kept operations, the inspection and patrol work were carried out monthly. In the most observed statues, inside the Protection Zone, there were still 35 pig farmers breeding a small quantity of pigs. Persuasion works for stopping pigsty operations were still reinforced by the work team. Drainage pipelines water quality monitoring work. In this year’s project, a sampling water quality inspection and analysis in nine sampling drainage pipeline points inside the Water Resource Protection Zone was carried out each quarter. Up until December 19, 2006, it had completed the planned sampling inspection work analysis for four seasons. Neipu & Pingnan Industrial Park Inspection, patrol and testing work, During the project execution period from March 30, 2006 to December 19, 2006, 26 and 27 inspection and patrol works were carried out in Neipu Industrial Zone and Pingnan Industrial Zone respectively. During the project execution period from March 30 , 2006 to December 19, 2006, 19 sampling works in Service Center Combined Wastewater Treatment Plant were carried out. The inspection and patrol work on business units inside the Zone Aiming at 22 business units in the water pollution control list inside the Neipu Industrial Park and 33 business units in the water pollution control list inside the Pingnan Industrial Park, In a total of 115 and 165 inspection and patrol works. This year adopted Donggang (Dingtoujiao), Wanluan (Chengde, Wugou), Wanluan (Sihgou, Luliao, Liouhuang), Chunrih, and Sagaran five volunteered river watch teams to enhance a good communication in-between environmental protection organization and the volunteered watchmen. Except holding associate training and seminars at the initial stage, the work team also helped to hold related activities. During the project execution period, as of November 30, 2006 the work results were summarized in the following table.
Keyword
compelled,remove,and,indemnification,river,watch,teams
Open
top